County · checked November 19, 2026
Do I need a shed permit in Miami-Dade County, Florida?
Yes. You need a permit.
Putting up a shed needs a permit. The county lists sheds with the structural work that still needs a permit even when the job is under $7,500. It does not publish a square-foot size that is exempt. Taking a storage shed down is different: removal with no electrical or plumbing is on an exempt list, inside a $5,000 cap for that whole list over 12 months.
Rules change, and a handout can be older than the code book. This page was checked on November 19, 2026. Confirm it with the local building department before you buy materials or hire someone.
Unincorporated Miami-Dade County. The county says these notes are its own unless it says otherwise, and another agency can still ask for a permit.
Cutoffs they actually printed
New or structural shed work
Permit required
Sheds are named with the structural work that still needs a permit under the under-$7,500 program.
What the page says
Even under a $7,500 job value, the county says electrical, plumbing, structural work, mechanical work, and gas work still need permits. Structural work in that sentence includes wind-resistant fences and sheds.
Even if your project stays under $7,500, the following work always requires permits: Electrical work. Plumbing work. Structural work (including windows, doors, wind-resistant fences, and sheds). Mechanical work. Gas work.
Miami-Dade County permit exemptions · checked November 19, 2026
Removing a storage shed, when that work has no electrical or plumbing, is on the no-building-permit list. That list is capped at $5,000 of combined work in 12 months. Installation is a different sentence.
Removal of storage sheds which do not have electrical and/or plumbing work associated with such removal.
Miami-Dade County permit exemptions, single-family section · checked November 19, 2026
One block of exemptions, including some fence and deck items, only applies when all of that listed work together stays at or under $5,000 in any 12-month period.
The total cost in the aggregate of all the below noted work performed by owner-builders or contractors in any 12-month period cannot exceed $5,000.00.
Miami-Dade County permit exemptions, single-family section · checked November 19, 2026
Fee
No fee for this job was printed on the page we checked.
The permit-exemption page does not print a dollar fee for this job. The $5,000 and $7,500 figures on the page are exemption caps, not prices.
Who to call
Miami-Dade County Regulatory and Economic Resources
11805 SW 26 Street, Miami, FL 33175
Also in Miami-Dade County
- Deck · It depends
- Fence · It depends
- Water heater · It depends
Nearby, same question
No neighboring jurisdiction is written up beside this one.
Shed permit rules by county also covers Phoenix, Berkeley, Marion County, Ocala, Orange County, Tampa, Las Vegas.
Questions this page answers
- Do I need a shed permit in Miami-Dade County, Florida?
- Putting up a shed needs a permit. The county lists sheds with the structural work that still needs a permit even when the job is under $7,500. It does not publish a square-foot size that is exempt. Taking a storage shed down is different: removal with no electrical or plumbing is on an exempt list, inside a $5,000 cap for that whole list over 12 months.
- Is there a size or height cutoff in Miami-Dade County?
- New or structural shed work: Permit required. Sheds are named with the structural work that still needs a permit under the under-$7,500 program.
- How much is the permit fee in Miami-Dade County?
- The permit-exemption page does not print a dollar fee for this job. The $5,000 and $7,500 figures on the page are exemption caps, not prices.
- Who do I call to confirm the shed rule?
- Miami-Dade County Regulatory and Economic Resources. Phone 786-315-2000. Email [email protected]. Rules on this stuff change. Confirm it with them before you buy materials or hire someone.